Works after water damage (November 2017)

Works after water damage

Works following leak detection (November 2017)

Works following leak detection

Furniture installation in a living room (November 2017)

Furniture installation in a living room

Wall and ceiling painting (October 2017)

Wall and ceiling painting

Refresh for this studio

Refurbishment of a T2 apartment (June and September 2017)

Refurbishment of a T2 apartment

  • Opening of the entrance on the living room to allow the installation of an equipped kitchen. Painting and installation of PVC slides on existing floor.

 

  • Complete refurbishment of the bathroom : bathtub replacement, laying of tiles on the wall and on the floor and washstand manufacturing.

 

  • Painting and floor refusbishment of the bedroom and the toilet.

 

Bathroom and toilet refurbishment (July 2017)

Bathroom and toilet refurbishment

Bathroom : Application of a new colored resin on wall and installation of PVC slides on existing floor.

 

Toilet : Painting and installation of PVC slides on existing floor.

Replacement of hair salon lighting (July 2017)

Replacement of hair salon lighting

The brightness restored by the old lighting system was insufficient.

Creation of a new lighting system consisting of suspensions of vintage LED bulbs for an industrial atmosphere.

Toilet refurbishment (June 2017)

Toilet refurbishment

Bathroom refurbishment (May 2017)

Bathroom refurbishment

New retro style refurbishment for this bathroom.

Room refurbishment (Avril 2017)

Room refurbishment